Toyota — AIR CONDITIONER

1-27 Installation Procedure The installation procedure is the reverse of the removal procedure. Note: After installation, bleed air from the fuel system. Prepare an oil receiver since the hydraulic oil will run out when the piping is disconnected. Caution: At the time of maintenance, inspection, adjustment or replacement of the torque converter ASSY, remove the parking brake air chamber before disconnecting the battery terminal. Point Operations [Point 1] Removal Installation: Disconnect the piping to make the material handling pump as illustrated at left. [Point 2] Removal Installation: Hoisting Caution: Do not remove the torque converter level gage piping but fix it on the engine side.

[Point 3] Removal Installation: Remove the lower nuts on both the engine and torque converter sides for easy positioning at the time of reinstallation on the vehicle. Position Weight Center of gravity Engine side :2 places Torque converter side :1 place Approx. 1,200 kg (2645 lb) Above the con- tact surface between the engine and torque converter