5.2 ENGINE GEAR TRAIN INSTALLATION AND TIMING NOTE: For ease of installation on idler gear number one, roll the gear into idler gear number two. 18. Install the spindle, thrust washers, idler gear number one, and gear plate onto the cylinder block by engaging the teeth of idler gear number one into the crankshaft gear teeth first, then roll upward into idler gear number two. Torque to 100 N·m (73 lb·ft). 19. Install the air compressor. Refer to section 41.4. NOTE: When installing idler gear number four, verify that the part number on the gear is facing the block. 20.
On the DD15, with the cone of the idler gear number four facing outward, install the thrust washer onto the spindle then install the spindle onto the idler gear number four. 21. On the DD15, install the assembled thrust washer, spindle and idler gear number four onto the cylinder block. Torque to 100 N·m (73 lb·ft). NOTE: Tool J-47487 should remove with ease. If not, check gears for proper installation. 22. Remove the idler gear number three tool (J-47487). 23. Check that the idler gear number one is flush with the rear side of the crankshaft gear and that the idler gear number four on the DD15 is flush with the front side of the crankshaft gear. 24. Install the camshaft housing.
Refer to section 3.3. 25. Lubricate the camshaft journals and install the camshafts into the camshaft housing. 26. Mark the camshafts TDC indicator triangle located on the inside of the camshaft gear with a suitable marker. All information subject to change without notice. 5-10 DDC-SVC-MAN-0081 2010 Copyright © 2010 DETROIT DIESEL CORPORATION