Mack Trucks — 5-111.bk

5-111.bk Page 133 Monday, July 10, 2006 2:26 PM 113 6. Install a new O-ring on the filter housing base (Figure 115). The O-ring should be installed dry, non-lubricated. 115 Figure 113 — Apply Loctite ® 271 to Spindle Threads 5. Assemble the new spindle to the oil filter mounting adapter. Use an accurately calibrated torque wrench with a 5/8 crow’s foot to tighten the spindle to 26 lb-ft (35 N m). 114 Figure 115 — O-Ring Installation 7. Install a new ULTRA PLUS rotor over the spindle. 8. Install the cover assembly and tighten the retaining nut to 19 lb-ft (26 N m). 9. After one hour, start the engine and check for leaks.

Allow the Loctite ® to cure for a minimum of one hour before starting and running the engine. Figure 114 — Tightening Spindle Page 133 MAINTENANCE 1. O-Ring 2. Filter Base