RECONDITIONING THE ENGINE (S/N 522311001 & ABOVE) (CONT’D) Turbo Charger Removal and Installation (Cont’d) Figure 60-80-256 P-63013 Remove the turbo charger [Figure 60-80-256] . Installation: Prelubricate the turbo charger by spraying a drop of oil into the oil supply line. NOTE: In the event of severe engine oil contamination, drain and flush the engine oil cooler, cab heater and plumbing. Drain the engine oil from the crankcase and replace the engine oil and filter. (See Replacing Oil And Filter on Page 10-90-2.) Start the engine and run at idle until oil pressure is assured. Work the unit until operating temperature of engine is maintained for approximately 15 minutes.
Idle and cool the down engine approximately 3 to 4 minutes, and stop the engine. Drain the engine oil from the crankcase again, replace the engine oil and filter. (See Replacing Oil And Filter on Page 10-90-2.) Re-start engine, check for leaks and performance. 442 Excavator 60-80-74 Service Manual