BOOM LOAD HOLDING VALVE (CONT’D) Figure 20-200-76 Assembly (Cont’d) Figure 20-200-74 3 2 1 P-36105 1 Install the 2 fittings (Item 1) [Figure 20-200-76] . P-36108 Figure 20-200-77 Install the poppet (Item 1) and plug (Item 2) in the port (Item 3) [Figure 20-200-74] . 2 1 Figure 20-200-75 4 1 3 P-35997 Install the seal (Item 1) in the seal carriers (Item 2) [Figure 20-200-77] . P-36106 NOTE: Make sure the lips (Item 3) fit into the grooves (Item 4) [Figure 20-200-77] on the seal carrier. Install the O-ring (Item 1) [Figure 20-200-75] on the fittings. 442 Excavator 20-200-12 Service Manual