BOOM LOAD HOLDING VALVE (CONT’D) Figure 20-200-88 Assembly (Cont’d) Figure 20-200-86 4 1 2 1 3 P-36096 Install the poppet (Item 1), spring (Item 2) and washer (Item 3) into the port (Item 4) [Figure 20-200-88] in the housing. P-36114 Install the O-ring (Item 1) [Figure 20-200-86] on the plugs. (Ported plug shown.) Figure 20-200-89 Figure 20-200-87 1 1 2 1 P-36095 P-36097 Install the bolt (Item 1) [Figure 20-200-89] . Install the 3 plugs (Item 1) and ported plug (Item 2) [Figure 20-200-87] . NOTE: Make sure the ported plug is installed in the port marked “E”. 442 Excavator 20-200-15 Service Manual