Bobcat Company 442 — Removal And Installation

COUNTERWEIGHT (CONT’D) Figure 40-170-5 Removal And Installation (Cont’d) Figure 40-170-3 1 2 1 2 P-40182 Install a chain hoist (Item 1) [Figure 40-170-5] on the counterweight service lifting bracket. P-40187 Install the counterweight service lifting bracket (Item 1) [Figure 40-170-3] on the counterweight. NOTE: Use a lifting device of sufficient capacity. Raise the hoist until the weight of the counterweight is supported by the hoist. Figure 40-170-4 Figure 40-170-6 1 1 P-40186 P-40183 Use two bolts (Item 2) [Figure 40-170-3] 16 mm x 35 mm MC Grade 8,8 and one bolt (Item 1) [Figure 40-170-4] 20 mm x 35 mm MC Grade 8,8 to fasten the lifting bracket to the counterweight.

Remove the lock nut (Item 1) [Figure 40-170-6] washers and bolt from the bottom of the counterweight. 442 Excavator 40-170-2 Service Manual