Komatsu · 237 pp.

SEAM02050501 PC200, 200LC-5 & PC220, 220LC-5 Hydraulic Excavator

Related manuals

Contents

Document text

MAIN MENU

Operation & Maintenance SEAM02050501 Manual Pc2~0,2~oL~-5 Pc220,220Lc4 HYDRAULIC EXCAVATOR SERIAL NUMBERS Pc200,200Lc :45001 a”d “p PC220,22OLC :35001

Page 1

MAIN MENU

QUICK REFERENCE INFORMATION MACHINE MODEL NAME & MACHINE SERIAL NO. ENGINE MODEL NAME 81 ENGINE SERIAL NO. DISTRIBUTOR’S NAME &TELEPHONE NO. PERIODIC SERVICE DELIVERY ITEM DATE SERVICE METER PERIODIC PERIODIC PERIODIC PERIODIC CONSUMABLE PARTS

Page 2

MAIN MENU

FOREWORD This manual describes procedures for operation, handling, lubrication, maintenance, checking, and adjustment. It will help the operator or anyone realize peak performance through effective, economical and safe machine operation and maintenance. Please read this manual carefully BEFORE operating the machine. Please continue studying this manual until proper operation is completely reinforced into personal habit. This manual describes the basic techniques. Skill is performed as the operator or anyone get the correct knowledge and performance of the machine. Operation, inspection, and maintenance should be carefully carried out, and the safety must be given the first priority.

Safety precautions are indicated with A marks and technical precautions with t marks in this manual. The safety information contained in this manual is intended only to supplement safety codes, insurance requirements, local laws, rules and regulations. Some illustration pictures are different from your machine as technical improvement is continuously reflected on it. Revision to up-to-date manual’s content is performed in later editions. This operation & maintenance manual may contain attachments and optional equipment that are not available in your area. Please consult your local Komatsu distributor for those items you may require.

Materials and specifications are subject to change without notice. -l-

Page 3

MAIN MENU

BREAKING IN YOUR NEW MACHINE Each machine is carefully adjusted and tested before shipment. However, a new machine requires careful operation during the first 100 hours to break in the various parts. If a machine is subjected to unreasonably hard use at the initial operation stage, the potential of performance will prematurely deteriorate and the ser- vice life will be reduced. A new machine must be operated with care, parti- cularly with regard to the following items. After starting, let the engine idle for 5 minutes to allow proper engine warm-up prior to actual operation. Avoid operation with heavy loads or at high speeds.

Sudden starting or acceleration, unnecessarily abrupt braking and sharp turning should be avoided. During the initial 100 hours, the work equipment fixing pins are to be greased before each operation. Greasing is to be repeated after operation of the boom, arm and bucket is conducted several times. At the first 250 hours of operation, the machine should be maintained in the following manner: 1) Checking and adjustment of engine valve clearance 2) Changing fuel filter cartridge See maintenance table in the maintenance section. t When replacing oil filter elements (cartridges), check their interiors for dirt and dust. If heavily collected, check for possible cause before starting operation.

* Hours of operation are indicated by the service meter. -2-

Page 4