INVERSION AND REPLACEMENT OF BUCKET Stop the machine on a firm, flat surface. When performing joint work, make clear signals to each other and work carefully for safety’s sake. 1. Select a flat surface and stabilize the bucket. (a): Bucket cylinder (b): Link (c): Arm 2. * After removing the stop bolt and nut for each pin, extract pins A and B. After removing the pins, make sure that they do not become contami- nated with sand or mud and that the seals of bushing on both sides do not become damaged. Reverse the bucket. After reversing the bucket, correct the direction and inclination of mount- ing pin holes (1) and (2) then firmly stabilize the bucket so that it does not shake about.
Couple the arm to hole (I), then connect the link to hole (2). After mounting the stop bolt and nut for each pin, apply grease to each pin. When replacing bucket, adjust bucket clearance. (Refer to ADJUSTMENT) The bucket on the PC300,3OOLC-5 MIGHTY cannot be reversed. 3. * 4. 5. * * - 80 -