Komatsu — STARTING ENGINE

. OPERATION MACHINE OPERATIONS AND CONTROLS OPERATION MACHINE OPERATIONS AND CONTROLS dial (2) to the center position between LOW position, and will flash 10 3 - 71 3. dia IDLE an d HIGH I 4. tarting EAT check th at pre-heating m onitor (4) l ights up After abo ut 30 s econds , pre-heatin g monit seconds to indicate that pre-heatin g is finished. REMARK The monitor and gauge also light up wh en the key i s at the HEAT position, but this doe s not in dicate any problem . 5. When en gine pre-heatin g monitor ( 4) goes off, t urn the key in stating s witch (3) to the START pos ition to start the engine. 6. When th e engin e start, release the key in the s tarting switch (3).

The key will return a utomaticall y to the ON position . 7. Keep the engine idle for t he initial 15 second s rig ht after i t has been started, and do n ot operate an y contro l lever or the fu el adjustment di al during th at time.