OPERATION TRANSPORTATION TRANSPORTATION 3 When transporting the machine, observe all related laws and regulations, and be careful to assure safety. PRECAUTIONS FOR TRANSPORTATION 3 This machine must be divided into several units for transportation. When transporting the machine, please consult your Komatsu distributor. LIFTING MACHINE 3 q Never carry out the lifting operation with any person on the machine. q Always make sure that the wire rope used for lifting the machine is of ample strength for the weight of the machine. q Never try to lift the machine in any posture other than the posture given in the procedure below. There is danger that the machine may lose its balance.
q When lifting the machine, pay careful attention to the center of gravity to maintain the balance. When lifting the machine, carry out the operation on flat ground as follows. 1. When lifting the machine, choose level ground and do as follows. Pass the wire ropes between the 1st and 2nd track rollers from the front of the machine and the 1st and 2nd track rollers from the rear. However, if the machine is equipped with a track roller guard, pass the wire ropes under the track. 2. Set the lifting angle of the wire rope to 30 ° to 40 ° , then lift the machine slowly. 3.
After the machine comes off the ground, stop the lifting operation and wait for the machine to stabilize, then lift the machine slowly. q The lifting load is 35 tons. 3-125 WARNING WARNING