Komatsu — CHECK AND ADJUST TRACK TENSION

MAINTENANCE PROCEDURE MAINTENANCE CHECK AND ADJUST TRACK TENSION 4 For details of starting the engine and operating the work equipment, see "BEFORE STARTING ENGINE (3- 73)", "STARTING ENGINE (3-89)", "AFTER STARTING ENGINE (3-94)", and "WORK EQUIPMENT CON- TROLS AND OPERATIONS (3-109)" in the OPERATION section. The wear of the pins and bushings on the undercarriage will vary with the working conditions and type of soil, so inspect the track tension frequently in order to maintain the standard tension. Stop the machine on firm, horizontal ground when carrying out the inspection and maintenance. Checking 1.

Run the engine at low idling, then move the machine forward for a distance equal to the track length on ground and stop the machine slowly. 2. Place wooden bar (3) on top of the track from No. 2 roller (1) to No. 3 roller (2). 3. Measure the maximum deflection between the bottom sur- face of the wooden bar and the top surface of the track shoe. Deflection "a" should be 10 to 30 mm (0.8 to 1.2 in). Adjustment Grease inside the adjusting mechanism is under high pressure. Grease coming from plug (1) under pres- sure can penetrate the body, causing injury or death. For this reason, do not loosen plug (1) more than one turn. Do not loosen any part other than plug (1).

Furthermore, do not bring your face in front of the plug (1). If the track tension is not relieved by this procedure, please contact your Komatsu distributor for repairs. Increasing Track Tension Prepare a grease gun. 1. Pump in grease through valve (1) using a grease gun. 2. To check that the tension is correct, move the machine slowly forward and in reverse. 3. Check the track tension again, and if the tension is not cor- rect, adjust it again. 4-28 WARNING WARNING