Komatsu — CHECK WELDED STRUCTURE

MAINTENANCE PROCEDURE MAINTENANCE CHECK WELDED STRUCTURE 4 (Color check) Cracks in welded structures can be seen easily with a color check. Check the revolving frame, center frame, boom, and arm every 1000 hours. In particular, carry out a color check on the important check points (marked with a circle). The procedure for the color check is as follows. 1. Prepare the materials needed for the color check. (Detergent, penetrating agent, developing solution) 2. Spray with detergent and wash to remove all the dirt and oil from the place to be checked. 3. After washing, dry the area, then spray with penetrating agent and leave for 5 - 20 minutes. 4.

Spray with detergent, then clean the surface with a cloth. 5. Clean the surface again, then spray with developing solution. 6. Leave for 15 - 20 minutes, then check visually for cracks. If there are any cracks, color can be seen. 7. If there are any cracks, carry out the repair procedure to repair. (A): Important check points (F): Front q Revolving frame 4-66