Hyundai Construction Equipment — l4gc

3-32 STARTING SYSTEM 10. INSTALLATION OF REAR BRACKET 1) Before removing the bushing, measure the bushing press-fit depth. 2) Remove the bushing as shown in the illustration. 3) Press-fit a new bushing as the depth measured proce- dure 1). L4GC358A ASSEMBLY 1. Install the overrunning clutch to the armature shaft front end. 2. Install the stop ring and snap ring to the armature shaft front end and completely press the stop ring toward the snap ring. Stop ring Overrunning clutch Stop ring clutch Snap ring L4GC359A 3. When installing the lever to the front bracket, take care of the direction. If the installation direction is in reverse, the pinion will move outward only. L4GC360A