4-4 GENERAL INSTRUCTION FOR MPI INSPECTION 1. When checking the alternator for charging, never remove battery (+) terminal. (If peak voltage of alternator is not absorbed by battery, it is possible to burn out ECU power terminal element.) 2. 1. When inspecting circuit, use a digital multi-meter or a LED of 1M or more. (When using normal valve, if heavy load current is sent to ECU, it is possible to burn out driving TR.) 3. When disconnecting ECU harness, necessarily turn Igni- tion switch OFF. (It is possible to damage ECU element by surge.) 4. When removing battery terminal, turn Ignition switch OFF. (It is possible to damage ECU element by surge.) 5.
When checking A/CON for operation, use a hi-scan and when from the outside (relay driving source), use its har- ness tool. (It is possible to burn out ECU.) 6. When welding vehicle body, necessarily remove ECU first. (It is possible to damage ECU element by surge.) 7. When charging battery from outside charger, remove bat- tery (vehicle side) terminal. (If supply voltage exceeds rated voltage of EUC, It is pos- sible to burn out ECU.) 8. When charging battery or starting engine with outside charg- ing power, never use it of 16V or more. (If supply voltage exceeds rated voltage of EUC, It is pos- sible to burn out ECU.) 9. For circuit test, do not use sensor ground as earth.
(If heavy load current is run to sensor ground, It is possible to burn out PCB ground circuit.)