Hyundai Construction Equipment — l4gc

GENERAL 4-7 RPM inspection Standard : 700 100rpm ISA inspection Spark plug inspection Standard: 0.7-0.8mm o Inspect compression if necessary o Compression Standard: 15.5-16.5 kg/cm Compression inspection Not OK (50 - 400 rpm) Fuel pressure inspection o Fuel pump o Fuel filter o Fuel pressure regulator o Regulator (-) pressure check Injector inspection Injector condition Ignition timing inspection BTDC 2 5 /700rpm o Wiring connection o ECU power 1. Fusible link 2. Fuse 3. MPI main relay o Engine cooling temperature sensor o MAP sensor o Injection signal circuit 1. Injector wiring 2.

ECU MPI electronic circuit inspection L4GC255A ENGINE HESITATION OR INSUFFIENT ACCELELATION Vacuum leak inspection in Intake line o Oil tilt cap o Oil dipstick o Hose connection o PCV hose Clean or replace element Air cleaner element inspection Continued