hyundai — l4gc

MAIN MOVING SYSTEM 2-50 DISASSEMBLY 1. Remove the cylinder head assembly. Press ram NOTE Put an identification mark on the connecting rod and cap before disassembly to refer to the original position and direction. Installer 2. Remove the oil pan and remove the oil screen. Support 09234-33001 3. After removing the connecting rod cap, remove the piston and connecting rod assembly from the cylinder. Arrange the connecting rod bearing in cylinder number order. Remover Piston 4. Using the special tool piston pin setting tool (09234- 33001) , disassemble the piston from the connecting rod as below. Connecting rod Adaptor 1) Remove the piston ring.

2) When placing the assembly on a press, face the front mark on the piston upward. 3) Using the press, remove the piston pin. L4GC079A INSPECTION PISTON AND PISTON PIN 1. Check the piston for scratch, wear, etc. and replace it if necessary. 2. Check the piston ring for break, damage and abnormal wear and replace it if necessary. When replacing the piston, the ring should be replaced also. 3. Check that the piston pin is inserted in the piston hole and replace the piston and pin if necessary. Piston should be smoothly pressed at normal room temperature. PISTON RING 1.

When measuring the side clearance of piston ring, if the measured value is out of the limit, insert a new ring to the ring groove and re-measure the side clearance. Item Specified value Limit Side clearance of piston ring No.1 0.04 ~ 0.08mm 0.1mm No. 2 0.03 ~ 0.07mm 0.1mm