Weichai — Weichai WD10 Diesel Engine Service Manual

Service Manual for WD10 Diesel Engine (6) Disconnect EVB oil pipe and pipe joint; (7) Disconnect injector wiring harness, remove injector oil return pipe and high pressure fuel pipe, refer to disassembly of fuel system for details; (8) Remove the injector, refer to disassembly of fuel system for details; (9) Remove cylinder cover shields and its gaskets; (10) Remove rocker assembly and pushrod, refer to disassembly of valve mechanism for details; (11) Remove cylinder cover assembly, and take down the gaskets; Refer to the chart below to tighten the bolts, some tips: 1) Pre-tighten the main bolts to 200Nm according to the order and mark the bolts.

2) Pre-tighten the auxiliary nuts for 90° according to the order, and mark the new position of the nuts. 3) Tighten the main bolts for further 90° according to the order , and mark the new position of the bolts. 4) Tighten the auxiliary nuts for another 90° according to the order, and the tightening torque should get to 120~160Nm. 5) Tighten the main bolts for another 90° according to the order, and the tightening torque should get to 240~340Nm. (12) Remove inner and outer springs of intake and exhaust valves, and then take out the spring seats, valve collets and valves, refer to disassembly of valve mechanism for details; (13) Remove valve rod seal cartridges.

4213 Steps to Assemble Cylinder Cover Attachments Assembling steps are contrary to disassembling ones. 37