. OPERATION OPERATION Stockpile operations mean the loading of sand and other loose materials. PRECAUTIONS FOR USING LOAD AND CARRY METHOD When traveling continuously with load and carry operations, choose the correct tires to match the operating conditions, or choose the operating conditions to match the tires. If this is not done, the tires will be damaged, so contact your Komatsu distributor or tire dealer when selecting tires. 3 - 122 Clearing f allen stones and rocks from the operating area and maintaining t he surface will exte nd the tire life a nd give improved economy For operations on normal road surfaces, rock digging operations:
High end of range in air pressure cha Stockpile operations on soft ground: Average pressure in air pressure chart If the deflection of the tire i s excessive, raise the inflation pressure within th e limits given in the table to give a suitable deflection (see deflection ratio).
Tire size (pattern) H Free height (mm) Inflation pressure (MPa{kg/cm2}, PSI) Normal road Stockpile Digging When shippe from factory Stockpile 55.5/80-57-68PR (L5 Rock) (Standard) 929 0.54 to 0.59 {5.5 to 6.0, 78.1 to 85.2} 0.54 to 0.59 B {5.5 to 6.0, 78.1 to 85.2} oth front and r 0.59{6.0, 85.2 65/65-57-62PR (L5 Rock) (If equipped) 992 0.44 to 0.49 {4.5 to 5.0, 63.9 to 71.0} 0.44 to 0.49 B {4.5 to 5.0, 63.9 to 71.0} oth front and r 0.49 {5.0, 71.0