www.changlin.com.cn 10 mm Install the cover and a new gasket. Torque Value: 24 N*m [18 ft-lbl Assemble the intake piping and connect the cold starting aid if used. Install and bleed the high pressure fuel lines. Jacket‐Water Aftercooler and Gasket‐ Replacement Preparatory Steps: Disconnect the cold starting aid , if used. Remove the air crossover tube. Remove high pressure fuel lines. Drain 2 liters (2.1 U.S. Quarts) of coolant. 136 / 167 pages