. OPERATION DETAILED CONTROLS AND GAUGES (2): For 24V power supply for starting motor at rear of battery relay (65A) Fusible link (2) is taped to the nearby wiring harness. When carrying out inspection or replacement, check the wiring harness number. REMARK A fusible link refers to the large-sized fuse wiring installed in the high current flow portion of the circuit to protect CONTROLLER Controller installed. 3 - 68 FUSIBLE LI If the engine st arting motor does not work when the eng ine startin switch key is t urned to the START po sition, fusible links (1) and (2 are suspected of disconnection. In th at case, open up the door a the machine's left rear to check and (1):
For 24V p ermanent power suppl electrical com ponents and wiring fro m burning , in the s ame way as an NOTICE ater, mud, or juice spill on the controller. This will caus m occurs in the controller, do not repair it by yoursel ct your Komatsu distributor for repairs. Do not let w failures. If any proble Please conta ct your Komatsu distribut n the controller. Thi s will caus TOOL BOX in this box. Store the tools When the doo r at the machine's left r ear is opened, the tool box i