hitachi — Main Circuit

SYSTEM/Hydraulic System Combined Operation Circuit (ZW250) Lift Arm Raising/Bucket Dumping When the bucket is dumped with the lift arm raised, pilot pressure shift the lift arm and bucket spools in the control valve. Also, the same pilot pressure that changed the lift arm spool in the control valve shifts the selector valve spool downward as well. Pressure from the own pump is applied to Port LS1 of the priority valve, but Port LS2 is not pressurized because it is connected to the hydraulic oil tank. Pressure at Port LS1 causes larger force than the spring force of the priority valve, and moves the spool right.

By movement of the spool, pressure oil from the main pump flows to the lift arm cylinders through the check valve in the control valve and the lift arm spool, and raises the lift arm. Pressure oil from the main pump also flows to the bucket cylinder though the flow rate control valve in the control valve and the bucket spool, and dumps the bucket. Lift arm raising operation is more heavy loaded than the bucket dumping operation, but pressure inside the spring chamber rises in the bucket dumping operation because shift of the selector valve is over.

Raised pressure in the spring chamber prevents the flow rate control valve from moving much, and flow of pressure oil to the bucket spool is restricted. As a result, flow rate to the lift arm cylinders is secured, causing smooth operation of the lift arm cylinders and bucket cylinder. T2-3-12