Hitachi Construction Machinery — Hydraulic Circuit

COMPONENT OPERATION / Control Valve ZW250 Main Circuit Main circuit contains a parallel circuit, which enables compound operations. Main circuit (between the pump and the cylinder) is provided with the main relief valve. The main relief valve prevents pressure inside the main circuit from increasing over the set pressure during operation (when any control lever is operated). Front circuit (between the control valve and the cylinder) of the lift arm bucket is provided with the overload relief valve.

Overload relief valve prevents surge pressure from being developed be external loads in the front circuit and from increasing over the set pressure at neutral position of the spool (neutral position of the control lever). T3-2-16