hitachi — Transmission Control Valve

COMPONENT OPERATION / Drive Unit At End of Clutch Connection (Refer to Pressure Oil Wave B of T3-9-32.) Finally, pressures in pressure chamber (f) and pressure chamber (h) become equal. Spring (3) is assembled in pressure chamber (h), but as the spool diameter in the pressure chamber (f) is larger than the diameter corresponding to the pressure chamber (h) plus spring (3) force, the modulation spool (2) is pushed to fully stroke. Therefore, completely opening oil passage (c) and the oil passage (e). (Refer to the drawing below.) As a result, the clutch pressure and the regulator pressure become equal and constant.

In Shift Down Condition from Forward 2nd Speed to 1st Speed [at DSS] Pressure increase of the 1st Speed clutch pressure is similar to “Speed Shift Change from Neutral to 2nd Speed.” Pressure decrease of the 2nd Speed clutch pressure is operated reversely, and the clutch pressure is gradually lowered by gradually lowering the electric signal (electric current value) from the high condition. Overlapping the clutch pressure of the partner clutch pressure by gradually raising the 1st Speed clutch pressure and gradually lowering the 2 nd clutch pressure eliminates lack of torque at the time of shift down in digging, and achieves smooth workability.

Proportional solenoid valve and the modulation spool organize a set in terms of construction, and enables obtaining constantly best modulation pressure wave by combining the pressure increase characteristics and the pressure decrease characteristics. (Refer to Clutch Oil Pressure Wave on T3-9-32.) 2 f 3 To 2nd Speed Clutch T4GC-03-09-033 c h e 1 - Modulation Spool 2 - Modulation Spring T3-9-35