3. BOOM PRIORITY SYSTEM ARM CYLINDER BUCKET CYLINDER BOOM CYLINDER TRAVEL MOTOR SWING MOTOR RCV PEDAL P T TRAVEL (4) (1) (2) (3) P1 P2 Pu PAtr PCtl PDtl PBtr Dr#, dr# SWING ARM BUCKET BOOM P T P T P1 T1 P2 T2 A1 PUMP PILOT PUMP A2 PUMP P3 T3 CROSS (4) (1) (2) (3) (4) (1) (2) (3) P (T/joint) T P A H G F E D B J A1 Psv(Pump) P3 P4 PG(S/Motor) P01(MCV) HYDRAULIC TANK PAk PBk PDs PCs PCa a b d e f g h j PS c PDa T(dr1) P2 LINE FILTER PCsp PAb1 PBb1 P1 210S3HC04 When carrying out the combined operation of swing and boom up, the boom up operating speed is lowered then normal operation. To increase working efficieny, swing speed reducing system is used.
When the boom up control lever is operated, the pilot oil from the pilot oil pump flows into the swing logic valve in the main control valve and oil flow rate to the swing motor decreased. Then, the boom up speed is increased. This is called the boom priority system. 3-9 RV2 Cck Bk BC1 N RV2 Cck DR9 Co Do PCo PDo OPTIO Ca Da BC2 NRV1 Cco CoR AkR LCk1 LCk2 DoR P04 PBk PAk PCbc PBa2 PAa2 DR6 P02 PBa Abk PBrc PAbk DR4 N LCo CaR DaR BUCKET BbkR PBa PCa PDa PAa DR7 CRa LCa PaL ARM1 LCa2 ARM2 PAa2 DR6 2 PCsp PDb2 BOOM Ccb 2 SWING P/R LCar LCbk BbR ARM REGEN Cs Ds PCs PDs DR5 SWING P03 Swing logic valve LCs AbR LCb CRb BOOM1 DR3 Ctl Dtl PCtl PDtl (RIGHT TRAVE ) L BtR AtR (LEFT) TRAVEL MRV