2. BOOM DOWN OPERATION ARM CYLINDER BUCKET CYLINDER BOOM CYLINDER HYDRAULIC TANK 220S3HC10 When the right control lever is pushed forward, the boom 1 spool in the main control valve is moved to the down position by the pilot oil pressure from the remote control valve. The oil from the A2 pump flows into the main control valve and then goes to the small chamber of boom cylinders. At the same time, the oil from the large chamber of boom cylinders returns to the hydraulic tank through the boom 1 spool in the main control valve.
When the down speed of boom is faster, the oil returned from the large chamber of boom cylinder combines with the oil from the A2 pump, and flows into the small chamber of the cylinder. This prevents cylinder cavitation by the negative pressure when the A2 pump flow can not match the boom down speed. And the excessive pressure in the boom cylinder rod side is prevented by the relief valve.
3-14 MU Pi2Pi1 P5Rs P4 Pn1 Pn2 T R A V E L M O T O R PCbc BC1 PDbc NRV2 Cck DR9 BC2 NRV1 Cco Co CoR Bk Ak P D0 o5 AkR PCo DoR P04 PBk PDo PAk OPTION BUCKET PCbc LCo LCk1 LCk2 Ca CaR Da DaR BbkR PBaDR7 CRa PaL PBa2 PCa PAa2 S W IN G M O T O R PDa ARM1 LCa LCa2 ARM2 DR6 PAa2 P02 PBa Ccb LCar Abk PCsp PBrc PDb2 PAbk BOOM2 SWING P/R LCbk ARM REGEN DR4 BbR Bb Relief valve Ab Cs DR2 Ds AbR CRb PbL P02 P04 PCs PBb1 PDs PAb1 DR5 SWING LCs LCb BOOM1 PDb2 P03 DR3 Btr Ctl BtR Atr PD Ctl tl AtR PBtr PDtl PAtr PattPS ( TR RIG AVH ET L) T(L RE AF VT E) L DR1 V2 P01 PtrPS TS MRV T1 P1 P2 Pu MA 1 MA 2 PP MILO PT P U P P U P U RV2 Cck Bk Ak P04 PBk PAk BUCKET PCbc BbkR PBa2 PAa2 ARM2 DR6 P02 PBa Abk PBrc PAbk ARM REGEN DR4 BC1 N RV2 Cck R9 Co 05 Do Co Do OPTION Ca Da BC2 NRV1 Cco CoR AkR LCk1 LCk2 DoR OPTION LCo CaR DaR BUCKET BbkR DR7 CRa PaL ARM1 LCa LCa2 ARM2 PAa2 DR6 Csp Db2 BOOM2 Ccb SWING P/R LCar LCbk ARM REGEN P02 Abk PBrc PAbk DR4 Cs Ds PCs PDs DR5 SWING Relief valve LCs BbR AbR LCb CRb BOOM1 P03 DR3 Ctl Dtl PCtl PDtl (RIGHT) PS TRAVEL DR1 BtR AtR (RIGHT) TRAVEL (LEFT) TRAVEL MRV