3. COMBINED SWING AND ARM OPERATION ARM CYLINDER BUCKET CYLINDER BOOM CYLINDER HYDRAULIC TANK When the swing and arm functions are operated, simultaneously the swing spool and arm spools in the main control valve are moved to the functional position by the pilot oil pressure from the remote control valve. The oil from the A1 pump flows into the swing motor through swing spool and the arm cylinder through arm 1 spool. The oil from the A2 pump flows into the arm cylinder through the arm 2 spool of the right control valve. The upper structure swings and the arm is operated. Refer to page 2-48 for the swing operation preference function.
220S3HC19 3-25 MU Pi2Pi1 P5Rs P4 Pn1 Pn2 T R A V E L M O T O R PCbc BC1 PDbc NRV2 Cck DR9 BC2 NRV1 Cco Co CoR Bk Ak P D0 o5 AkR PCo DoR P04 PBk PDo PAk OPTION BUCKET PCbc LCo LCk1 LCk2 Ca CaR Da DaR BbkR PBaDR7 CRa PaL PBa2 PCa PAa2 W IN G M O T O R PDa ARM1 LCa LCa2 ARM2 DR6 PAa2 P02 PBa Ccb LCar Abk PCsp PBrc PDb2 PAbk BOOM2 SWING P/R LCbk ARM REGEN DR4 BbR Bb Ab Cs DR2 Ds AbR CRb PbL P02 P04 PCs PBb1 PDs PAb1 DR5 SWING LCs LCb BOOM1 PDb2 P03 DR3 Btr Ctl BtR Atr PD Ctl tl AtR PBtr PDtl PAtr PattPS ( TR RIG AVH ET L) T(L RE AF VT E) L DR1 V2 P01 PtrPS TS MRV T1 P1 P2 Pu MA 1 MA 2 PP MILO PT P U P P U P U RV2 Cck Bk Ak P04 PBk PAk BUCKET PCbc BbkR PBa2 PAa2 ARM2 DR6 P02 PBa Abk PBrc PAbk ARM REGEN DR4 BC1 N RV2 Cck R9 Co 05 Do Co Do OPTION Ca Da BC2 NRV1 Cco CoR AkR LCk1 LCk2 DoR LCo CaR DaR BUCKET BbkR R7 CRa aL ARM1 LCa LCa2 ARM2 PAa2 DR6 sp b2 BOOM2 Ccb SWING P/R LCar LCbk BbR ARM REGEN P02 Abk PBrc PAbk DR4 P P D Cs Ds Cs Ds R5 SWING LCs AbR LCb CRb BOOM1 P03 DR3 Ctl Dtl PCtl PDtl PattPS ( TR RIG AVH ET L) DR1 P01 PtrPS TS 03 R3 tl tl Ctl Dtl (RIGHT) PS TRAVEL R1 BtR AtR (LEFT) TRAVEL MRV