3. ENGINE STALL 侍 Before carrying out below procedure, check all the related connectors are properly inserted. 1) INSPECTION PROCEDURE Check electric valve SPEC : 200~550 See TEST 3 Wiring diagram 210S6MS51 6-46 YES YES Check pressure at EPPR Valve SPEC:5~20 kgf/cm2 NO ric See TEST 4 PPR YES 0 mA Check resistance NO at EPPR valve SPEC : 17.5佳1 凂(20佘C) See TEST 2 NO Cause Remedy Not enough engine power Defective EPPR valve Short circuit or poor connection between CN-50-CN-2 or CN-50-CN-75 Defective EPPR valve Contact cummins engine dealer Replace Check and repair wire harness Replace No.11 MCU EPPR (-) R IG AIN) EPPR (+) 8 1 7 2 8 7 1 2