7-22 2. MAIN CONTROL VALVE Part name Inspection item Criteria & measure Casing 余Existence of scratch, rusting or corrosion. 余#In case of damage in following section, replace part. - S liding sections of casing fore and spool, especially land sections applied with holded pressure. - Seal pocket section where spool is inserted. - Seal section of port where O-ring contacts. - S eal section of each relief valve for main, travel, and port. - O ther damages that may damage normal functions. Spool 余#Existence of scratch, gnawing, rusting or corrosion. 余#Insert spool in casing hole, rotate and reciprocate it.
余#Replacement when its outside sliding section has scratch(Especially on seals- contacting section). 余#Correction or replacement when O-ring is damaged or when spool does not move smoothly. 余Damage of load check valve or spring 余Insert poppet into casing and function it. 余#Correction or replacement when sealing is incomplete. 余#Normal when it can function lightly without being caught. Around spring 余#Rusting, corrosion, deformation or breaking of spring, spring seat, plug or cover. 余Replacement for significant damage. Around seal for spool 余External oil leakage. 余Correction or replacement. Main relief valve, port relief valve & negative control relief valve 余External rusting or damage.
余Contacting face of valve seat. 余Contacting face of poppet. 余Replacement. 余Replacement when damaged. 余Replacement when damaged.