(3) Put No.1 carrier sub assy into No.2 sun gear along spline. Screw M10 I-bolt to No.1 carrier sub assy. Lifting up No.1 carrier sub assy and align planetary gear and tooth of ring gear by rotating planetary gear by hands. Rotate No.1 carrier sub assy by hands to fit No.1 carrier into No.2 sun gear spline. - - - 2209A8SM47 (4) Put No.1 sun gear into No.1 carrier sub assy. Be sure to maintain it vertical with ground. And align with No.1 planetary gear spline. (5) Rotate No.1 carrier sub assy by hands to check noise. 2209A8SM48 MEASURING CLEARANCE & ASSEMBLING NAME PLATE 8) (1) Check the clearance between ring gear and No.1 sun gear using a tool with dial gauge.
Check the clearance Dial gauge = -0.3 ~ +2.95 2209A8SM49 8-74