Hyundai Construction Equipment — 9. BOOM, ARM AND BUCKET CYLINDER

GROUP 9 BOOM, ARM AND BUCKET CYLINDER 1. REMOVAL AND INSTALL 1) BUCKET CYLINDER Removal Expand the arm and bucket fully, lower the work equipment to the ground and stop the engine. Operate the control levers and pedals several times to release the remaining pressure in the hydraulic piping. Loosen the breather slowly to release the pressure inside the hydraulic tank. Escaping fluid under pressure can penetrate the skin causing serious injury. Fit blind plugs in the hoses after disconnecting them, to prevent dirt or dust from entering. (1) 侍 侍 侍 13031GE18 Bucket Cylinder 侍 Arm Set block between bucket cylinder and arm. 刮 Wooden block 220S8DA14 Remove bolt (2), nut (3) and pull out pin (1).

Tie the rod with wire to prevent it from coming out. 刯 2 侍 3 1 21078DA15 Disconnect bucket cylinder hoses (4) and put plugs (5) on cylinder pipe. 到 5 4 4 21078DA16 8-125 8-125