Hyundai Construction Equipment — 10. UNDERCARRIAGE

Install bracket (5) attached with seal (3). 刳 5 8-168(1) Knock in the spring pin (7) with a hammer. 刴 5 7 1 8-168(2) 刵 5 Lay bracket (5) on its side. Supply engine oil to the specified level, and tighten plug. 8-168(3) 8-149