The amount of regeneration fluid is changed by movement of the arm regeneration spool. A few fluids of the oil that is supplied to the head side of the arm cylinder passes the selector spool ( in this case, the selector spool is opened by the arm in pilot pressure) built in the arm regeneration block through internal passage and is pushed the piston C. The amount of the regeneration oil from the rod side of the arm cylinder to the tank passage is increased by the movement of the piston C and the arm regeneration spool to the right direction and the arm regeneration flow is decreased as much increased oil.
The pressure of the arm cylinder head increases, then, the arm regeneration flow decreases. Furthermore, the arm regeneration cut-off pressure is supplied to the port of the spring opposite side and the arm regeneration spool is moved to the right direction fully. The flow from the arm cylinder rod to the tank passage is maximum condition.
Arm regen cut-off valve internal passage Arm regen cut-off block Selector spool RCV signal Arm regen cut-off pressure Arm regeneration Piston C Boom 2 and swing priority D-D' (SW PRI, BM 2 & ARM REGEN) Boom 1 Arm regen Arm 2 P1 BLOCK SPOOL SECTION RCV signal Arm 2 Arm 1 Ca Da Cylinder head side Cylinder rod side E-E' (ARM 1 AND ARM 2) ARM REGENERATION PASSAGE 220S2MC32 2-46