. OPERATION OPERATION ripper, carry out ripping at right (B) (1) (2) Tilt back (MAX) Slope face Ripping base Cross ripping On jobsites with hard bedrock, for rocks and boulders which are impossible to break or dig up with one ripping pass, carry out the second ripping pass at right angles to the first ripping direction. At the edge of cliffs, where it is impossible to apply the ripper in a cross direction, make the space between the shanks smaller and carry out ripping. During the ripping operation, if there is any hard bedrock, carry out ripping in the opposite direction to the direction where the ripper was applied.
If it is still impossible to break up the rock, break up the area around the bedrock a little at the time. When carrying out concentrated ripping of hard bedrock, the work efficiency is high if the ripper is applied to the whole of the digging face. 3 - 126 RIPPING BY SLOPE FACES (Giant ripper When carrying ou t ripping wor k at the edge of slope faces, make the ripper t ilt back (B) angle small, and if there is an area where the slope face (1) has apply ripper diagonally REMARK In the of angles to the slope f ace