. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE remove. 4 - 22 2. Turn main radiator cap (4) an d sub radiator cap (5) slowly, and 3. Prepare a container to catch th e coolant, pull out hose (6) of the main radiator at the bottom front right of the machine, then n the water. open drain valve (7) and drai The sub radiator is at the bott om front left of the machine. Pull out drain hose (8) in the sam and drain the water. e way, then open drain valve (9) 4. Open the drain valve (11) in th e water pump piping on the right side of the engine, and drain the coolant. 5. After draining the antifreeze s olution, close drain valve (7), (9) and (11), then fill with clean wa ter.
After the radiator is filled with water, start and run the engi ne at low idling speed. After the water temperature rises abov for about 10 minutes. e 90°C (194°F), run the engine alve (7), (9) and (11), and drain 6. Stop the engine, open drain v the water. 7. After draining the water, clean the cooling system with cleaning agent. For the cleaning method, see the instructions for the cleaning agent. (11). 8. Close drain valve (7), (9) and 9. Replace the corrosion resisto For details of the procedur e for replacing the corrosion RESISTOR CARTRIDGE AN D SUB CORROSION RESISTOR CARTRIDGE (PAGE 4 10. Add coolant mixed with antifr eeze until it overflows from the water filler.
Decide the proportions of anti freeze and water according to the table for the mixing rate o f water and antifreeze 11. To bleed the air from the cool ing system, run the engine at low idle for 5 minutes, and fo r a further 5 minutes a high idle. (When doing this, le