MAINTENANCE LUBRICATING WORK EQUIPMENT On job sites where there is a lot of heavy-duty work, or on job sites where operations are carried out continuously for more than eight hours, reduce the greasing interval and carry out greasing more frequently. 1. Place the work equipment horizontally in contact with the ground, then stop the engine. 2. Clean each fitting, then using a grease pump, pump in grease through the grease fittings marked by the arrows. 3. After greasing, wipe off any old grease that was pushed out. (1) Bucket pin (2 places) (2) Bucket link pin (2 places) (3) Dump cylinder pin (2 places) (4) Lift cylinder pin (4 places) (5) Lift arm pivot pin (2 places) WA320PT-5L 3-35