A. Arm link joint pin (1 point) B. Link joint pin (2 points) B B C. Arm bucket joint pin (1 point) D. Bucket link joint pin (1 point) D A C FG001438 Figure 35 E. Bucket cylinder rod pin (1 point) E Figure 36 FG001439 Grease Swing Bearing 1. Park machine on firm, level ground. Lower the front attachment to the ground and shut down engine. 2. There are three grease fittings for the swing bearing. Do not over lubricate. Purge old grease with new. Remove all purged grease. FG013204 Figure 37 OP001762 Inspection, Maintenance and Adjustment 4-24