SECTION 5 MAINTENANCE Page 42 5.15. MOUNTED EQUIPMENT 5.15.1. COMPLETE BLADE REMOVAL AND INSTALLATION Fig. 5.29. Complete Semi-U Blade If for any reason the complete blade is to be removed from the tractor; proceed as follows: 1. Place the blade on level ground and block up the ends of the push arms close to the trunnions. This will maintain a proper height for reassembly. For machines with hydraulic tilt: Remove the bolts and remove lower part of the front cooler guard. Remove hose clamp securing the hoses to the right side of cooler guard and disconnect the hoses (A and B). Fit and secure plugs to the ends of hoses and pipes. Fig. 5.30. Blade Tilt Hoses Connection Location TD-20H DRESSTA