Assembling the drum 7 - 26 Issue: 02-10 Figure Work to be executed 34 33 2 2 4 Completing the vibration drive side, continued: • Slightly grease O ring (33) to seal the bearing housing/ vibration drive and push it onto the drive. • Calibrate the clutch (34) on the vibration drive (2) using the depth gauge. • Bolt vibration drive to the side plate with the connections pointing towards the grease nipple. Drum (4) completely assembled and ready for instal- lation in drum frame.