Hyundai Construction Equipment — Chapter 7.2

Installing the drum 7 - 28 Issue: 02-10 Figure Work to be executed 1 2 6 Completing the hydraulic connections: • Attach the hydraulic connections according to the marking on the drives. • Remove sealing plugs from hydraulic connections. • Attach the hydraulic connections to the drum drive (1) and the vibration drive (2). • Detach brake connection from gear motor. • Wedge rear wheels (6). • Start Diesel engine, release parking brake and move drive lever slightly forwards and backwards to check whether the drum rotates correctly. • Fasten the drum frame to via lifting gear to a crane (2). • Lift the drum frame so far that the supports under the drum frame can be removed.

• Perform the roller functions.