hyundai — Trainingshandbuch PF2501-2601englisch-02.10-unvollst

Illustration 2 3 3 3 2 3 Illustration Maintenance work: Checking the oil level at the rear axle 2 3 2 3 3 3 50 operating hours after the initial operation and subsequently, at intervals of 500 operating hours: NOTE! i Prior to carrying out work at the rear axle, secure the compaction roller against rolling. Activate (apply) • the parking brake and put wheel chocks under the tires. WARNING! Environmental protection! The axle oil may not penetrate the ground, pollute water or leak into the sewer system. Checking the oil level in the axle housing: • Unscrew the fi ller screw (2) from the axle housing. • The oil level must be visible underneath the opening or tangible with a fi nger.

• Screw the fi ller screw (2) back in. 500 operating hours after the initial operation and subsequently, at intervals of 1500 operating hours: Changing the oil in the axle housing : • Place a suffi ciently dimensioned oilpan under the three oil drain plugs (3). • Screw out the oil drain plugs (3) and drain the axle oil. • Dispose of the waste oil in accordance with waste disposal key 130202 (EU). • Screw the oil drain plugs (3) back in. • Be sure to refer to the Table of lubricants with regard to the required axle oil specifi cations. • Fill new axle oil into the axle housing via the fi ller screws (2). • Tighten the fi ller screws (2).