Hyundai Construction Equipment — Trainingshandbuch PF2501-2601englisch-02.10-unvollst

7.2.3 Dismantling the drum Dismantling the drum 7 - 18 Issue: 02-10 Figure Work to be executed 1 2 3 5 4 6 7 8 9 • To remove the vibrator shaft lift the drum on the vibration drive side with a crane and place it vertically up. • Erect a working platform beside the drum. • Turn the bolts (2) out of the side plate (3). • Turn forcing screws (1) into two opposite threads until the side plate (3) can be removed. • Turn the six cheese-head screws (4) out of the bearing cover (5). • Remove the bearing cover (5) with the shaft sealing ring. • Turn the bolts (6) out of the bearing housing (8). • Loosen the bearing housing using the forcing screws (9). • Remove the bearing housing (8).

• Unscrew the clutch (7) from the shaft.