. OPERATION OPERATION OPERATION OPERATION 3 - 143 6. If there is too much material l oaded in the bucket, dump and tilt the bucket quickly to remove t he excessive load. prevents spillage of the load during hauling.
. OPERATION OPERATION OPERATION OPERATION 3 - 143 6. If there is too much material l oaded in the bucket, dump and tilt the bucket quickly to remove t he excessive load. prevents spillage of the load during hauling.