FIGURE 7-3. BODY PIVOT STRUCTURE INSTALLATION 13. Lift the pivot structure over the body and lower into position against the rear of the body as shown in Figure 7-3. If stick electrode is used, use as large a diameter rod as practical to weld floor and front sheet joints. 14. Lower the pivot structure until the front aligns with the body sills. The following sequence must be followed for front sheet: 15. If necessary, use a hydraulic jack or crane to raise the center of the body to allow the pivot structure to fit inside the bolsters. Start all cap- screws in pivot structure. First Pass: Back step and skip weld in 10 increments along the entire length of the joint.
(See diagram in Figure 7-4.) Repeat the same procedure until the entire joint is filled. DO NOT stop welding until entire joint is complete. 16. Tighten all floor, front sheet, and canopy bolts. Use a chalk line to align the front of the canopy. 17. Tighten all pivot structure bolts. The body floor “V” groove must also be welded using the same procedure given above for the front sheet; start welding at the front and work to the rear. 18. Install filler plates and backer strips for body pivot structure to body sill front weld joints. 19. Check alignment and straightness of compo- nents, fit of body, hoist cylinder pins, canopy alignment to body structure, and general fit of structures. 20.
Tack weld complete. Body Welding Procedures The following field welding procedures must be observed: Use dry weld rod or weld wire. Surfaces to be welded must be dry and the temperature above 50°F (10°C). FIGURE 7-4. FRONT SHEET & FLOOR JOINT WELDING PROCEDURE FAM0703 930E FIELD ASSEMBLY MANUAL Page 7-3 Body Assembly