FINAL ASSEMBLY 1. Body weld-up and chassis assembly must be completed. Before the body is lifted off the ground, guy ropes should be tied to each of the four corners of the body to keep it in a stable position for easier installation. There are two methods of installing the body depending on the cranes available. a. If the truck is running and can be maneuvered, two 50 ton cranes can be used, one positioned at either side of the body. The body is then lifted high enough to allow the truck to be reversed propelled under the body (Figures 8-1, 8-2 & 8-3). b.
If a large crane of approximately 150 ton is available, the body can be lifted high enough and swung over the chassis and installed in a similar fashion to that in step (a) above. Page 8-2 930E FINAL ASSEMBLY FAM0807 Dump Body Installation