Komatsu — 930E CHASSIS ASSEMBLY PROCEDURE

18. Lift the RH diagonal tube into position (Figure 6-26). The weight of the tube is 150 lbs. (68 kg) . Loosely install the capscrews until the decking is in place. After installation of the deck, tighten the twelve capscrews (M16) to 177 ± 17 ft.lbs. (240 ± 24 N.m) torque. 19. Lift the four air intake tubes and hump hoses into place. Ensure that all the clamps are properly tightened. Refer to Figure 6-24. Page 6-30 930 FIELD ASSEMBLY MANUAL FAM0607 Chassis Assembly