Komatsu — 930E CHASSIS ASSEMBLY PROCEDURE

29. Lift the operator cab into position. Refer to Figures 6-40 and 6-41. Tighten the thirty two capscrews (M24) to a torque of 590 ± 59 ft.lbs. (800 ± 80 N.m) . The diagnonal tubes must be tightened after the installation of the cab. Refer to steps 17 & 18. Page 6-44 930 FIELD ASSEMBLY MANUAL FAM0607 Chassis Assembly