Komatsu — 930E CHASSIS ASSEMBLY PROCEDURE

Front Wheel Installation NOTE: Remove all dirt and rust from mating parts before installing wheel assembly. 42. Grip wheel assembly with the tire handler and align the tire inflation hose and wheel hub. Position rim onto wheel hub studs. 43. Lubricate all stud threads and nut seating flanges with lithium base grease. Install and tighten nuts in the fol- lowing sequence: a. Install six nuts at the 12 O'clock and six nuts at the 6 O'clock positions. Tighten each nut to 1715 ± 100 ft. lbs. (2326 ± 136 N.m) torque. b. Install three nuts directly below the 3 O'clock and three nuts directly above the 9 O'clock positions. Tighten the nuts to 1715 ± 100 ft. lbs. (2326 ± 136 N.m) torque. c.

Install three nuts directly above the 3 O'clock and three nuts directly below the 9 O'clock positions. Tighten these nuts to 1715 ± 100 ft. lbs. (2326 ± 136 N.m) torque. d. Install the remaining nuts and torque in a clockwise direction to 1715 ± 100 ft. lbs. (2326 ± 136 N.m) torque. e. Retorque all nuts in a clockwise direction to the required 1715 ± 100 ft. lbs. (2326 ± 136 N.m) torque. Refer to Figure 6-61 & 6-62. After the truck has been assembled and is operational, the truck must be operated for a short period of time, and the torque on the wheels re-checked. Tighten the wheels to the specified torque. Page 6-64 930 FIELD ASSEMBLY MANUAL FAM0607 Chassis Assembly