Kaiyi HL955 — Kaiyi HL955 User Manual

4. HYDRAULIC OIL WARM UP PROCEDURE 1) Install temperature reader (see temperature reader installation procedure in this group). 2) Run engine at high idle. 3) Hold a hydraulic function over relief to heat the oil. 4) Periodically cycle all hydraulic functions to distribute warm oil. 5) Heat oil to test specification (approx. 45 C). 侍 Ride control system (option) Attention 1) Before carrying out any maintenance work the accumulators must be unloaded (zero pressure). B A 2) For this, loosen the nut (A) and bolt (B) counterclockwise with 10 mm spanner. The accumulator will be unloaded (zero pressure) in less than a minute. 侍 3) The lifting system must firstly be secured against lowering.

4) After carrying out maintenance work, screw the bolt (B) and nut (A). В Tightening torque A : 2.04 kgf В m (14.8 lbf В ft ) Ride control valve 7609A6WE28 6-56