CNH T8000 — AUTOMATIC TEMPERATURE CONTROL (ATC) OPERATION

Section 50 - Climate Control - Chapter 1 Electrical Test Refer to Schematic Sections 60 through 62 at the end of this section. Power and Ground With high pressure switch activation, 5V is present at pin 33 at controller and pin 1 at the switch. The switch is grounded to the chassis. With low pressure switch activation, 5V is present at pin 35 at the controller and pin B at the switch. The switch is grounded to 36 at the controller. With no pressure switch activation, both circuits test 0.0V at the switch and at the controller. High Pressure Switch and Circuit Test 50-1-41 Steps and Test Point Corrective Actions 1.

Refer to A/C Troubleshooting Foldout and follow the conditions for performance testing. Install A/C high and low side pressure gauges. High reading above 400 psi ± 10 psi (2758 kPa ± 69 kPa)? YES - Perform corrective actions from A/C Troubleshooting Foldout. NO - Go to next Step. 2. Shut off the tractor. Disconnect the switch from the harness and the unit. Check that switch is closed across pins A and B . OK - Go to next Step. NOT OK - Replace switch. 3. Reinstall the switch in the unit; do not reconnect the harness. Keyswitch ON and ATC switch to “A.” Is 5V present at pin B at the harness to the switch? YES - Go to next Step. NO - Go to Step 5. 4. Keyswitch OFF.

Measure resistance from pin 2 at the switch to ground. Less than 1 ohm? YES - Go to next Step. NO - Locate open condition and repair between pin A and ground. 5. Keyswitch ON and ATC switch to “AUTO.” Is 5V present at pin D1 at the controller? YES - Locate open condition and repair between CJ8- 34 and pin 1 at the switch. NO - Test the controller. See ATC Controller Tests in this section.